Nuneaton and Bedworth, in numbers

Projects: Nuneaton and Bedworth

Nuneaton and Bedworth local authority area. Every figure carries its own date.

The local plans, investments and decisions worth following.

3 selected records checked against official sources. A plan is not a completed project; each record shows the stage its source establishes.

Armson Road, Bedworth

Pearson Place council homes

The council completed new homes on a former garage site, with flats and family houses ready for occupation.

Construction completed; homes ready for occupation · evidence dated 2026-10-06

Responsible body: Nuneaton and Bedworth Borough Council

What the source says: The linked public record supports this project’s location, scope and stated stage; promised benefits are not measured outcomes.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named location verified; a current ward boundary match and the extent of benefits have not been verified. No ward-level outcome is inferred.

No verified ward footprint is assigned.

New Council homes honour Exhall mining disaster survivor | Nuneaton and Bedworth Borough Council →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

A former garage site now provides council homes →

Make room for homes people can afford →

Target support where disadvantages overlap →

How to track delivery →

Miners’ Welfare Park, Bedworth

Bedworth Physical Activity Hub

The new indoor leisure hub is open. Demolition and outdoor facilities form later phases, so the whole park project should not be described as finished.

Indoor hub open; outdoor works remain · evidence dated 2026-06-11

Responsible body: Nuneaton and Bedworth Borough Council

What the source says: The linked public record supports this project’s location, scope and stated stage; promised benefits are not measured outcomes. A council update dated 11 September 2026 records temporary-path removal, remaining car-park and football-pitch works: https://www.nuneatonandbedworth.gov.uk/news/article/421/removal-of-temporary-path-in-miners-welfare-park-bedworth

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named location verified; a current ward boundary match and the extent of benefits have not been verified. No ward-level outcome is inferred.

No verified ward footprint is assigned.

Work to start soon to demolish old Bedworth Leisure Centre | Nuneaton and Bedworth Borough Council →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

An open building can still have unfinished surroundings →

Target support where disadvantages overlap →

How to track delivery →

Abbey Street, Nuneaton

Grayson Place college campus

The council handed the building to North Warwickshire and South Leicestershire College. The September announcement planned learner access the following week; projected economic benefits are not measured results.

Building handed over; learner opening announced · evidence dated 2026-09-17

Responsible body: Nuneaton and Bedworth Borough Council

What the source says: The linked public record supports this project’s location, scope and stated stage; promised benefits are not measured outcomes.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named location verified; a current ward boundary match and the extent of benefits have not been verified. No ward-level outcome is inferred.

No verified ward footprint is assigned.

Keys to new cutting-edge Nuneaton college campus handed over to NWSLC | Nuneaton and Bedworth Borough Council →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

Town-centre teaching space can widen access to learning →

A building’s forecast benefits may not all materialise →

Connect local skills to local opportunities →

Target support where disadvantages overlap →

How to track delivery →